JOURNALISM | LIBRARY | POWERSCHOOL | STUDENT EMAIL | GOOGLE CLASSROOM | USD 473 | SCHOLARSHIPS
Line

3 Bedroom House

This House was the major technology project of the Construction Technology, Industrial Technology, and Cabinetmaking I & II of Chapman High School, under the supervision of Josh Schlesener and Nathan Wendel. Jones Eletric was responsible for the electrical work. Contruction meets the city building specifications. This house was contructed of good quality materials and workmanship.

 

Dimensions

  • 28' x 52'
  • 1456 sq. ft. of Living Space

Framing

  • Engineered Floor Joints
    - 16" on center
  • 2x6 Framed Walls
    - 16" on center
  • Engineered Roof Truses
    -24" on center
  • Wall 7/16 OSB
  • Roof 5/8 OSB

Exterior

  • Siding
  • Windows
    - Silverline by Anderson
  • 3-3' Metel plated doors

Interior

  • Flooring
    - Laminate Wood: Kitchen & Living Room
    - Carpet in the Bedrooms
    - Vinyl in the Bathrooms and Utility Room
  • Doors
    - Oak Hollow Core
  • Trim
    - Solid Oak
  • Cabinets and Bathroom Vanities
    - Oak
    - 5 Piece Panel Doors
    - Bathroom Countertops - Onyx Tops

Master Suite

  • 5' Tub Shower
  • Walk-in Closet

Great Room

  • Laminate Wood Floor
  • Kitchen
    - Walk-in Pantry
    - Island Bar
    - Countertops: Laminate Tops edged with Solid Oak
  • Bay Window
    - With Seating
  • Basement Access

Electrical

  • All completed by Jones Electric
  • 4 Ceiling Fans
  • Can Lights
    - Great Room
    - Master Suite
    - Bathrooms